header

EBS Services

Initial

EBS will review planned stormwater systems and we will provide a preliminary report on the anticipated storage volume savings.

Generally, we would review the Stormwater Pollution Protection Plan (SWPPP) or the Stormwater Management Plan (SMP) which are commonly prepared by an Engineer.

If EBS is contemplated prior to stormwater designs we will provide preliminary layouts.

Final

EBS will provide final hydraulic report in Word format.

Computations are provided using HEC-1 (2010 version) or Hydrocad

The EBS report is suitable for inclusion in the SWWP or SMP.

EBS will provide construction details for the control structures (AutoCad format).

EBS will fabricate and deliver the flow control panels to be installed in standard concrete boxes.